Inverter installation in Isolo Lagos

This is a brief on the installation done in Lagos Nigeria, for a 4 bedroom apartment with one sitting room, this project was carefully considered and calculated to give the client an expected backup time for the required load capacity. we made use of a durable brand of 2.5kva inverter 24vdc system which is to power the selected load in …

Getting an Inverter

Getting an Inverter is fast becoming inevitable in Nigeria its importance as become ever growing, most locality in Nigeria have at least 6 hours Power on daily bases which is makes it a good idea to have more 5-8 hours backup time could certainly be more than that range depending on how an individual makes use of the inverter, with …